legals  |   contact
10 Mar 10 19:28
  Welcome
  Learn To Fly
    Flying Schools
    Latest Flying School News
    Kid's page
Young Eagles
  General Information
    Who We Are
    Where We Are
    Facilities
    Our History
    Latest News
    Master Plan
    Aircraft Noise
    Contact us
  Airport Based Companies
    Scheduled Airlines
    Flying Organisations
    Ground Organisations
    Non-Aviation Organisations
  Pilot Information
    Aviation Operations
    Airport Security
    Airside Access
    On-Line Pre-Flight Briefing Info
    Airport Charges
    Conditions of Use
    Traffic Stats
    Photo Gallery

 

Preliminary Master Plan 2009

Produced by: Moorabbin Airport Corporation April 2009

 

Preliminary Draft Master Plan 2009

Preliminary Draft Environment Strategy 2009

The period for public consultation and submission of written comments on the Preliminary Draft Master Plan 2009 and Preliminary Environment Strategy 2009 is now closed.

No further submissions will be accepted.

Moorabbin Airport Corporation will have regard to all written comments submitted and if necessary modify the Draft Master Plan and Environment Strategy in the light of the points that have been raised. A copy of all written comments will be forwarded to the Minister for Infrastructure, Transport, Regional Development and Local Government for his review along with the Draft Master Plan and Environment Strategy submissions.

Submission of a Draft Master Plan and Draft Environment Strategy will be made to the Minister in early August 2009 and it is expected that a decision will be made on each document in October 2009. Copies of the Preliminary Draft Master Plan 2009 and Preliminary Environment Strategy 2009 are retained on this website for your information. However, until these have been approved by the Minister, the current Final Master Plan 2004 and Final Environment Strategy 2004 both remain in force.

A downloadable copy of the PDMP and PDES is available at no charge on the MAC website:
 

 

 

http://www.moorabbinairport.com.au/PDMP.pdf

166  Pages  5.00meg

 

http://www.moorabbinairport.com.au/PDES.pdf

68  Pages  1.25meg


   To get the latest Adobe Reader Update (No charge) Visit Here



The 2009 PRELIMINARY MASTER PLAN

The Complete Master Plan is 166 Pages. File Size: 5,050K in PDF Format. It can be downloaded as a complete document as per above -

Or you download it in FOUR (4) Sections at a time:
Please click the underlined links to download and read, you can also print them if you wish to.

Authorised and issued by Philip Anthony McConnell, Airport General Manager July 23 2009